PMP - Doing a forward and backward pass for CPM Analysis

CRITICAL PATH METHOD

An Idiots Guide on how to plan a project  

 Step 1: Watch the YouTube Video on the process of doing a forward and a backward pass.




Step 2: Do some practice

Practice sheet is available from clicking this hyperlink 

Answer sheet can be accessed by clicking this hyperlink

4 comments:

  1. would yo be able to solve this because i am having hard time:
    Activity Predecessor(s)
    A ---
    B ---
    C A
    D A
    E B
    F B
    G C, E
    H D, F

    ReplyDelete
  2. and this as well please and thank you:

    Charlie Cook (see question 1 above) was able to determine the activity times for constructing his chemical contaminant tracking machine.
    A) Cook would like to determine ES, EF, LS, and LF for each activity. Here are the activity times :
    Activity Time (weeks)
    A 6
    B 7
    C 3
    D 2
    E 4
    F 6
    G 10
    H 7

    a) Determine the slack time for each activity. b) Determine the total project completion time.
    c) Identify the activities on the critical path.
    d) Draw a Gantt chart for the project.

    ReplyDelete
  3. Thanks for your interest. The instructions above are pretty easy. I believe in teaching others how to catch a fish, but do not usually catch fish for them.

    ReplyDelete
  4. "Hi There,

    Very Nice post on PMP chapter test link.That was very helpfull.keep posting"

    ReplyDelete